Building Fee Table

Building Permit Fee Formula

Building Permit Fees are determined by the following formula: Building type construction x square footage x (*modification factor) = total. 

*The modification factors are:

  • Basement Finish - .0022
  • New Construction - .003
  • Remodel - .0015

The building type is based on the IBC designation for the type of construction materials and the formula amount is determined by the graph below.

Building Fee Table